Weekly update from the developers

Works carried out this week:

  • Joint holes excavated for streelight connections. The new LV cable installed and jointed by National Grid. Areas backfilled and reinstated
  • Continue with footpath construction from Lower Furlough including crossing points and tactile paving
  • Excavated for kerb brace to install drain kerbs to S278 redline boundary. Steel road plates installed across vehicular crossings
  • Completed digging and profiling works to pond 4 including low flow channel

Planned works this weekend:

  • There will be a road closure on Sat 25th
  • It will be our intention to continue with footpath construction and install of drain kerbs.
  • Additionally lamp heads will be swopped over following joint connection.
  • Access to all frontages will be maintained.

Next week:

  • Landscaping works to the basins
  • Continue 278 works along Mill Road (footpath and kerbs)